Scroll:Life mathematics >> profit and loss >> saq (4295)


Written Instructions:

For each Multiple Choice Question (MCQ), four options are given. One of them is the correct answer. Make your choice (1,2,3 or 4). Write your answers in the brackets provided..

For each Short Answer Question(SAQ) and Long Answer Question(LAQ), write your answers in the blanks provided.

Leave your answers in the simplest form or correct to two decimal places.



 

1)  

 If 11 men can built a wall 115 meters  long in 7 days, what length of a similar wall can be built by 16 men in 2 days.

meters


Answer:_______________




2)  

 If 14 men can built a wall 117 meters  long in 7 days, what length of a similar wall can be built by 19 men in 4 days.

meters


Answer:_______________




3)  

 If 14 men can built a wall 115 meters  long in 5 days, what length of a similar wall can be built by 16 men in 3 days.

meters


Answer:_______________




4)  

 If 15 men can built a wall 116 meters  long in 5 days, what length of a similar wall can be built by 16 men in 3 days.

meters


Answer:_______________




5)  

 If 15 men can built a wall 108 meters  long in 8 days, what length of a similar wall can be built by 20 men in 2 days.

meters


Answer:_______________




6)  

 If 11 men can built a wall 116 meters  long in 7 days, what length of a similar wall can be built by 20 men in 3 days.

meters


Answer:_______________




7)  

 If 11 men can built a wall 117 meters  long in 7 days, what length of a similar wall can be built by 17 men in 4 days.

meters


Answer:_______________




8)  

 If 13 men can built a wall 101 meters  long in 5 days, what length of a similar wall can be built by 17 men in 3 days.

meters


Answer:_______________




9)  

 If 11 men can built a wall 111 meters  long in 6 days, what length of a similar wall can be built by 17 men in 4 days.

meters


Answer:_______________




10)  

 If 14 men can built a wall 100 meters  long in 7 days, what length of a similar wall can be built by 19 men in 4 days.

meters


Answer:_______________




 

1)  

 If 11 men can built a wall 115 meters  long in 7 days, what length of a similar wall can be built by 16 men in 2 days.

Answer: 48 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    11    7        115
    16     2       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 11 to 16, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1611

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 7 to 2, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   27

                                       x     =   1611 x 27 x 115

                                              =  1.4545454545455 x 0.28571428571429 x 115

                                              = 48 meters



2)  

 If 14 men can built a wall 117 meters  long in 7 days, what length of a similar wall can be built by 19 men in 4 days.

Answer: 91 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    14    7        117
    19     4       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 14 to 19, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1914

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 7 to 4, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   47

                                       x     =   1914 x 47 x 117

                                              =  1.3571428571429 x 0.57142857142857 x 117

                                              = 91 meters



3)  

 If 14 men can built a wall 115 meters  long in 5 days, what length of a similar wall can be built by 16 men in 3 days.

Answer: 79 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    14    5        115
    16     3       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 14 to 16, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1614

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 5 to 3, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   35

                                       x     =   1614 x 35 x 115

                                              =  1.1428571428571 x 0.6 x 115

                                              = 79 meters



4)  

 If 15 men can built a wall 116 meters  long in 5 days, what length of a similar wall can be built by 16 men in 3 days.

Answer: 74 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    15    5        116
    16     3       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 15 to 16, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1615

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 5 to 3, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   35

                                       x     =   1615 x 35 x 116

                                              =  1.0666666666667 x 0.6 x 116

                                              = 74 meters



5)  

 If 15 men can built a wall 108 meters  long in 8 days, what length of a similar wall can be built by 20 men in 2 days.

Answer: 36 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    15    8        108
    20     2       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 15 to 20, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 2015

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 8 to 2, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   28

                                       x     =   2015 x 28 x 108

                                              =  1.3333333333333 x 0.25 x 108

                                              = 36 meters



6)  

 If 11 men can built a wall 116 meters  long in 7 days, what length of a similar wall can be built by 20 men in 3 days.

Answer: 90 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    11    7        116
    20     3       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 11 to 20, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 2011

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 7 to 3, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   37

                                       x     =   2011 x 37 x 116

                                              =  1.8181818181818 x 0.42857142857143 x 116

                                              = 90 meters



7)  

 If 11 men can built a wall 117 meters  long in 7 days, what length of a similar wall can be built by 17 men in 4 days.

Answer: 103 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    11    7        117
    17     4       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 11 to 17, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1711

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 7 to 4, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   47

                                       x     =   1711 x 47 x 117

                                              =  1.5454545454545 x 0.57142857142857 x 117

                                              = 103 meters



8)  

 If 13 men can built a wall 101 meters  long in 5 days, what length of a similar wall can be built by 17 men in 3 days.

Answer: 79 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    13    5        101
    17     3       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 13 to 17, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1713

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 5 to 3, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   35

                                       x     =   1713 x 35 x 101

                                              =  1.3076923076923 x 0.6 x 101

                                              = 79 meters



9)  

 If 11 men can built a wall 111 meters  long in 6 days, what length of a similar wall can be built by 17 men in 4 days.

Answer: 114 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    11    6        111
    17     4       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 11 to 17, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1711

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 6 to 4, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   46

                                       x     =   1711 x 46 x 111

                                              =  1.5454545454545 x 0.66666666666667 x 111

                                              = 114 meters



10)  

 If 14 men can built a wall 100 meters  long in 7 days, what length of a similar wall can be built by 19 men in 4 days.

Answer: 78 meters


SOLUTION 1 :

Soln  :

Number of MenNumber of daysLength of the wall in (m)
    14    7        100
    19     4       

Step :1

        Consider the No of men & Length of the wall. As the No of men increases from 14 to 19, the length of the wall also increases.

         It is in direct variation.

          The multiplying factor  = 1914

Step :2

       Consider the No of days & the length of the wall. As the No of days decreases from 7 to 4, length of the wall also decreases.

       It is in direct variation.

       The multiplying factor    =   47

                                       x     =   1914 x 47 x 100

                                              =  1.3571428571429 x 0.57142857142857 x 100

                                              = 78 meters